[1]
2018. The Execution of Key Performance Indicators in the Operational Phase of PFI Projects in Malaysia. Asian Journal of Quality of Life. 3, 12 (Jul. 2018), 157–167. DOI:https://doi.org/10.21834/ajqol.v3i12.152.